Technical support during on site installation

Stone installation is the most critical phase of the project and, of course, requires an accurate preliminary study where all aspects affecting the simplicity and speed of this process are carefully evaluated in order to avoid time delays and related penalties.
From our part we can provide support to the installation Company with the following services:

-     study of material hoisting and translation operations
-     setting-out of the building structure with reference axes marking and evaluation of the out-of-plumb and out-of-plane tolerances
-     definition of installation time schedule according to the site Manager requirements
-     working progress reports


 

  NATURAL STONE FACADE CLADDING

- preliminary technical consulting
- cost estimate
- design specifications

- shop drawings
- calculation report
- quality control
- technical support during production
- technical support during on site installation
  • 1Project
    ABU DHABI MOSQUE
  • 2Project
    529 BROADWAY - NEW YORK CITY (USA)
  • 3Project
    35 HUDSONYARDS TOWER 'E' - NEW YORK CITY (USA)
  • 4Project
    U.S.A. EMBASSY - BERLINn
  • 5Project
    KIA - KUWAIT
  • 3Project
    50 HUDSONYARDS - NEW YORK CITY (USA)
  • 3Project
    GRANDE MOSQUEE DJAMAA EL DJAZAIR - ALGER (ALGERIE)
  • 3Project
    TORRE UNICREDIT / TEATRO ALLA SCALA- MILANO (ITALY)
GS engineering s.r.l. - "Design and supply of anchoring system for stone cladding " 
v.le XX Settembre, 177/B - 54031 Avenza-Carrara (MS) - ITALY
Tel. (39) 0585 856667 - Fax (39) 0585 856669 e-mail: gsengineering@tin.it - info@gsengineeringsrl.it
P.IVA 01203300114